· Nanjing increased 2530 new energy bus

On May 22nd, the Nanjing Municipal Transportation Bureau will give priority to the “big meal” of the bus that will be completed in the public transportation, rental, long-distance passenger transportation, public bicycle and other industries. With the opportunity of the Youth Olympic Games, Nanjing will further improve the transportation security level.

【bus】

Newly purchased 2,530 buses, non-air-conditioned vehicles exit the main city

Before the Youth Olympic Games, the city's public transport added 2,530 new energy vehicles, including 1,000 pure electric vehicles. The two models were powered by natural gas and vehicle power, and the emissions were almost zero. In the main urban area, buses and non-air-conditioned buses below the national standard of 3 are fully eliminated, and new energy buses around the main stadium of the Youth Olympic Games are fully covered. It is strictly forbidden to release body advertisements for new buses.

Accelerate the construction and reconstruction of 19 bus stations, ensure the completion of the Shazhou bus stop site renovation before the Youth Olympic Games, and complete the construction of three bus stations including Nanjing South Railway Station West, Xianlin Lingshan Station and Baixia Science and Technology Park. Seven bus stations including Yancang Bridge, Baochuan Park South and Tianrun City were completed. At the same time, accelerate the construction of the taxi service center in Yulan Road.

【taxi】

1400 new taxis added, all drivers uniform

Among the 1,400 taxis on the road, 850 are medium and high-end taxis, the Peugeot 508 and Changan Rui, and the other are pure electric vehicles BYD E6. In order to solve the problem of charging pure electric taxis, about 300 charging piles will be built in the city by the end of June 2014. Jiangnan Company has a total of five charging stations, namely Jiangnan Rental Company, Tiexin Bridge, Mufu West Road, Chunjiang New City and Wanshou Village. There are 15 charging piles at each point, totaling 75 pieces. In addition, the two charging stations of Hexi New Energy Passenger Transport Co., Ltd. are located in Lotus Bridge and Green Expo Park.

Before July 1, 2014, all taxi drivers were uniformly dressed and licensed, and more than 1,000 individual taxi operators were required to implement uniform dressing requirements. The uniform white seat cover must be “small and change, and must be changed in three days”. The taxis that are not up to standard are suspended.

【Public bicycles】

By the end of July 2014, we will realize the “transfer and reunification”, and the citizen card can directly open the car borrowing function.

The three public bicycle operators in the city are working hard to promote the transformation of software and hardware such as IC cards, vehicles and locks. At the end of July 2014, the city's public bicycle services will be interconnected. At that time, only one card is needed, and public bicycles can be rented in various districts of the city. The car borrowed in Hexi can ride to Xinjiekou to return. The car borrowed in Jiangning can also be returned even if it rides to Xianlin.

At the same time, the citizen card will also open the public bicycle loan function, but it needs to be opened at the scene, and the operation is similar to the current park year card. A deposit of a certain amount is required when the function is opened. The deposit amount has not been determined. The deposit amount of the current three companies will be referred to. The outlets for the specific functions have not yet been determined.

Public bicycles are now being installed within the Gulou District in the northwestern part of the river. Before the Youth Olympics, the city will promote the development of 200 parking spots and 5,000 public bicycles in the Drum Tower and Jianye District of the main city. In 2014, the city will also come up with the entire city's public bicycle development plan. At present, the plans of various districts have been reported. Many of the new planned sites are located at the subway station, such as Hanzhongmen Station, Xi'anmen Station and Ming Palace Station of Metro Line 2, and Yudao Street near the subway station. Guanglu, Ruijin Road and Baixia Road also have stations. Yuhuatai District has also planned a number of bicycle stations connecting the Nanyan Line of the Metro Line 1 and the surrounding communities, covering the subway Huamiao Temple Station, Software Avenue Station, Andemen Station, Xiaoxing Station, Zhonghuamen Station, and at Renhengcui. Zhuyuan, Yadong International Commercial Street, etc. have layout points.

[dedicated lane]

17 “all-weather” Qingao dedicated lanes, after 5 matches, turned into bus lanes

During the Youth Olympic Games, Nanjing will set up a total of 17 lanes for Youth Olympics, including 54 new lanes for the Youth Olympics. The original dedicated roads available are mainly concentrated in Longjing Middle Road, New Model Road and Hexi. The five newly-built special roads include Pukou Avenue, Yangtze River Avenue, Yangtze River Tunnel (Pukou Avenue - Jiajiang Bridge Section), Jiangdong Road and other five sections, which will be identified by the ground label. After the Youth Olympics, some new special roads will be reserved as ordinary bus lanes, and the bus priority will continue to be promoted.

During the Youth Olympic Games, the Qingao dedicated lane will be set as a “all-weather” dedicated lane. According to the management measures adopted during the Asian Youth Conference last year, it is not necessary to score 100 yuan for the illegal driving of social vehicles. For the current “Sanzhong Road” (Central Road, Zhongshan Road, Zhongshan South Road) newly opened bus lanes, some taxis reflect the problem of people not calling when they are beckoning. The transportation department and the traffic control department are discussing countermeasures. Some temporary taxi stops are added to the road.

[Long-distance passenger transport]

Xiaohongshan Station was initially put into operation on June 28, 2014, and the micro-circulation bus line was opened.

At present, the transportation department reported to the municipal government that the plan is pending. On June 28, 2014, the Xiaohongshan Passenger Transport Station was put into operation, and the final time is waiting for approval. At present, the joint debugging and handover of facilities and equipment in the station is basically completed, and the surrounding roads and traffic organizations responsible for relevant departments will be fully seated in early June. The central administration and the comprehensive management department of Xiaohongshan Bus Terminal have already carried out work docking and have recently entered.

As the underground passage of the North and South Square of the station area has not yet been completed, passengers cannot directly pass through the North and South Squares. Therefore, after the opening of the Xiaohongshan Bus Terminal, the micro-circulation bus line will be temporarily opened at the beginning, from the South Square West Station, via Huangjiatun Road to the north. Square West Station, convenient for passengers to travel to the South and North Square.

Self Unloading Vessel

Self Unloading Ship,Self Unloading Vessel,Self Unloading Bulk Vessel,Self Unloading Bulk Ship

PT Cindo International Marine Trading , https://www.cimtvessel.com